Featured Case Studies

Featured Case Studies

The only Organisation specialising in providing Local Authorities with solutions using tried and tested systems achieving positive results.

Interest on claim

Special Consideration – Interest on claim

Details: On this project we were able to recover £39,000.00 against a bond value of £12,000.00 by enforcing the interest clause in the Section 38 (Highways Act 1980) Agreement.

Value of completed works exceeded bond

Special Consideration – Value of completed works exceeded bond

Details: Through extensive discussions and enforcement of the Section 38 (Highways Act 1980) Agreement the Developer completed works to the value of £304,467.96 against a bond value of £126,000.00.

Monies obtained from the Administrator

Special Consideration – Monies obtained from the Administrator

Details: The Developer was dissolved, and the Surety Provider was in Administration. We were able to secure the full bond value of £208,469.00 from the Administrator.

Obtained Commuted Sums from Developer

Special Consideration – Obtained Commuted Sums from Developer

Details: Obtained commuted sums in the sum of £131,924.57 from the Developer.

Enhanced Settlement

Special Consideration – Enhanced Settlement

Details: Despite an initial offer of £27,000.00, we were able to achieve settlement in the sum of £54,500.00.

Brewery additional funds recovered plus works in excess of bond

Special Consideration – Brewery additional funds recovered plus works in excess of bond

Details: Recovered additional funds for the Authority for emergency works already undertaken plus value of works exceeded bond value.

Superstore

Special Consideration - Superstore

Details: Multiple issues relating to defective works complicated by ongoing 9-month highway project nearby. Significant footpath / lane closures and diversions were required. Works still completed within 9 weeks allowing for 28 days approval of traffic light usage application and consultation with local residents and Businesses.

Epperstone Developments Limited

Special Consideration – Resident Feedback

Details: Demonstrates positive publicity generated for the Local Authority by utilising our services: “At last after 9 years of living on an unfinished development brilliant to drive and walk on properly finished tarmac surface thank you.”

Specialist Organisation

Special Consideration – Specialist Organisation

Details: Dealing with specialist organisation the Homes and Communities Agency. Complex matter with extensive unknown elements.